The Tuesday Night Club Official Web Site

The Tuesday Night Club on Tour

Index

Tour 2005

Index

Caldon Canal / Uttoxeter Canal lock No 1 and Froghall Basin. 

Trip down to the new basin was on 1st August 2005, overnight in the basin and early morning departure the next day.

Pict1906.jpg (134475 bytes)
The refurbished waiting shelter and new overhanging platform for Consall Forge Station. Caldon Canal.

Pict1909.jpg (144655 bytes)
The station building and new overhanging platform for Consall Forge Station. Caldon Canal.
Click Here for a 1975 view with the original wooden station building still standing!

Pict1910.jpg (131903 bytes)
The new fairly accurate clear plastic gauge overhanging the exit of Flint Mill Lock. This is for gauging Froghall Tunnel, if you just clear this you will get through the tunnel without touching.

Pict1912.jpg (134604 bytes)
Looking back at the Flint Mill Lock Froghall Tunnel Gauge. Caldon Canal.

Pict1921.jpg (120875 bytes)
Lock No 1 of the Uttoxeter Canal, going down to the newly refurbished Froghall Lower Basin.

Pict1923.jpg (120351 bytes)
Lock No 1 of the Uttoxeter Canal.

Pict1925.jpg (136717 bytes).
Lock No 1 of the Uttoxeter Canal

Pict1926.jpg (122314 bytes)
Froghall Lower Basin. Uttoxeter Canal.

Pict1928.jpg (130812 bytes)
Froghall Lower Basin. Uttoxeter Canal.

Pict1939.jpg (95731 bytes)
Lock No 1 of the Uttoxeter Canal - paddle gear.

Back to the Tour 2005 Index


Home Page | "Earnest" | "Beatty" | Canal Restoration